Every coordination error caught in the drawings is a change order that never hits your budget. Buildcheck identifies design risks at their source — before they compound into field costs — so your projected returns survive contact with construction.

On one project we caught a slab-thickness mismatch between structural and architectural worth roughly 6,000,000 lbs of concrete. Customers typically see 20–30x ROI under conservative assumptions.

We deliver a comprehensive review in about 2 weeks — faster than most internal cycles — with nothing for your team to install or manage.
Coordination issues found during construction don't just cost money — they stall the critical path and push delivery. Buildcheck catches them during CDs, before permit, so RFIs and rework don't move your certificate of occupancy.
Your team is good — Buildcheck gives them a head start so they can focus on design intent instead of hunting for missing dimensions and overlapping systems. It's an independent, exhaustive coordination check across every discipline, at a scale humans can't match under deadline.

One developer bet we'd find nothing in their IFC set. We found 140+ issues and saved the lots of headaches.
For best results run at 50-90% construction documents, around permit submission, and ahead of 100% IFC. That’s when drawings are detailed enough to check and there’s still time to act on any issues found.
Yes. Buildcheck can ingest custom design manuals, guidelines, playbooks, checklists to ensure designs are compliant with your existing QA/QC process.
Buildcheck is on par with manual reviews but faster and more comprehensive.
Developers typically see a 10-20x ROI mainly driven by reduced project delays which incurs additional days of financing cost and reduce time to revenue, in addition to change orders which eat into contingency.
Buildcheck reviews full 2D PDF sets across all disciplines architectural, structural, MEP, civil, landscaping, fire protection, low-voltage, and more — across all drawing types plans, sections, elevations, details to find coordination errors and omissions that would otherwise cost your project hundreds of thousands of dollars on site.
Yes. In fact, Buildcheck has unlimited seats and volume based discounts, making portfolio-wide review a sound decision.
Intake takes about five minutes and a full review can take 5 to 10 days depending on the number of drawings - versus 4-6 weeks for a comparable manual review.
Yes. Back-checks are free, and automatically tell you which issues have been resolved and which are still outstanding between revisions — so review stays continuous and on one platform.
Best fit is $10M+ hard cost with sets at 50–90% of construction documents — detailed enough to check, early enough to fix.
BuildCheck is SOC 2 Type II compliant, with annual audits and penetration testing.
Minimal — plus, Buildcheck offers white glove onboarding and customer support at no extra cost.